For the safety of the large number of runners and spectators attending the Bath Half event on Sunday, road closures and parking suspensions will be introduced throughout the course route. To ensure traffic flow around the closures, parking suspensions and temporary traffic arrangements will also be introduced on designated access routes.

Road closures will be introduced at 9.00am on Sunday 15 October, and roads will re-open in a staggered sequence as runners clear each section of road (and contractors have removed equipment). Live traffic updates can be found on the event social media.

Parking suspensions on the course route and access routes will apply at 6.00am (to allow time for council contractors to remove remaining vehicles before race start) and will be lifted as each section of road is re-opened.

Extended road closures and parking suspensions will apply on venue streets in Royal Victoria Park.

For more details and a closer look at the map of affected areas please download the residents information leaflet.